Box 7
Container
Contains 4 Results:
Specifications HH-166 for Furnishing and Installing Chlorine and Ammonia Equipment for the Tesla Portal Chlorinating Plant in the Coast Range Division of the Hetch Hetchy Aqueduct, 1936
File — Box: 7, Folder: 1
Identifier: Subseries 1_2:
Specification for Manually Operated Gate Valves for the Crystal Springs Pipe Line No. 2 (P.W.A. Docket 1510-6d), 1935
File — Box: 7, Folder: 2
Identifier: Subseries 1_2:
Specification No. 112 for the Construction of the Crystal Springs Pipe Line No. 2, Crystal Springs Dam to Burlingame (Federal Public Works Docket 1510-5C), 1936
File — Box: 7, Folder: 3
Identifier: Subseries 1_2:
San Francisco Water Department Specification No. 156, Construction of the Palo Alto Pipe Line (San Mateo and Santa Clara Counties), 1937-1938
File — Box: 7, Folder: 4
Identifier: Subseries 1_2: